Alert

In observance of the Independence Day national holiday, all Douglas County Government offices will be closed Thursday, July 4. Offices will reopen on Friday, July 5, for normal business. Many County services are available 24/7 by visiting online services.

×

01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Elections
Health Department

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers
Birth/Death Records
Restaurant Inspections
Community Health
Child Care Center Inspections
Septic System Inspections
Emergency Preparedness & Response
Disease Surveillance
Mental and Behavioral Health Education
Community Health and Clinical Services
Women, Infants and Children

03.

×
× Close
Public Works

US 85 Widening from Highlands Ranch Parkway to C-470

Under Construction

Budget

Total Approximate Construction Cost = $108 Million

Project Manager

Douglas County / CDOT / Kraemer North America
[email protected] 719-695-0052

Contractor

Kraemer North America
[email protected] 719-695-0052

Partners

  • Douglas County
  • CDOT
  • Chatfield Basin Developers (Sterling Ranch and Solstice Development)
  • Federal Highway Administration (FHWA)
  • Denver Regional Council of Governments (DRCOG)
  • Highlands Ranch Metro District

Project Update

Click here to receive updates on this project by email

Updated June 28, 2024

C-470 and US 85 interchange progress
Thank you for your patience! This week, crews reached a construction milestone by safely setting 20 new bridge beams over C-470, east of the newly built portion of the US 85 bridge this week. Bridge work will continue above C-470 next week, requiring nighttime single-lane closures.

Traffic Alignment Changes
Overnight Monday, July 1, travel lanes on US 85 near Town Center Drive will be moved to the outside of the roadway to allow crews to begin median installations. Use caution and heed the speed limit while navigating the new traffic pattern.

Left Turn Restrictions
As a reminder, you can only make left turns at signalized intersections. No left turns are allowed throughout the corridor at private driveways and unsignalized intersections. Access has changed to right-in, right-out only between Highlands Ranch Parkway and C-470, except for signalized intersections.

As a reminder, pedestrians and bicyclists are not permitted in the work zone. Please heed the closure signage and follow signed detours to safely cross US 85 along the trails.

See the “Schedule” section below for more detailed information on traffic impacts. For background information prior to construction, visit US85DouglasCounty.com

Description

This project will improve safety, mobility, and traffic operations by widening (from four to six lanes) and reconstructing a segment of US 85 (South Santa Fe Drive) from Highlands Ranch Parkway, extending north of  the C-470 Interchange to Dad Clark Gulch (which is located approximately 1,200 feet north of County Line Road). Major US 85 intersection improvements will occur at Highlands Ranch Parkway, Town Center Drive, Blakeland Drive, the C-470 Interchange ramps and at County Line Road. The project also includes the replacement and widening of the existing bridge that carries US 85 over C-470.

Multimodal improvements include bus stop enhancements, a new shared-use path for bicyclists and pedestrians on the east side of US 85, a below-grade crossing for the C-470 Trail at US 85, a below-grade crossing for the High Line Canal Trail at US 85, and a new pedestrian link from the Wolhurst community to the C-470 Trail.

The project also includes the addition of continuous auxiliary lanes, new asphalt paving, relocation of utilities, raised medians, new curb and gutter, and a new closed storm sewer system with water quality ponds.

Timeline: Fall 2022 to Fall 2025

Partial Continuous Flow Intersection (CFI) will be installed for the following traffic movements:

  • Southbound US 85 to Eastbound Highlands Ranch Parkway
  • Southbound US 85 to Eastbound Town Center Drive
  • Northbound US 85 to Westbound C-470

View a map of US 85 Interchange at the above 3 listed intersections.

Other projects along US 85 in Douglas County

Schedule

June 30- July 6:

There will be no traffic impacts or work operations over the 4th of July holiday beginning noon Wednesday, July 3 until 6 a.m., Monday, July 8. 

Major Impacts:

  • No major impacts.

Daily Impacts:

  • Single lane closures on C-470 at US 85 nightly from 7 p.m. to 5 a.m. Sunday, June 30 through Tuesday, July 2.
  • Single lane closures on northbound and southbound US 85 and on the C-470 ramps at US 85 from 9 a.m. to 3 p.m. daily, Monday, July 1, and Tuesday, July 2, and from 9 a.m. until noon, Wednesday, July 3, throughout the corridor.

Please give yourself extra time and pay attention to posted speed limits and signage. If weather conditions do not allow this work to take place as originally scheduled, crews will conduct this work at a later date.

Trail Closures
Three trail closures will stay in place into 2025 while crews install new underpasses to allow pedestrians and bicyclists to safely pass under US 85.

Bus Access: RTD, in partnership with the project team, has closed the Bus Route 402L stops on US 85 between County Line Road and Highlands Ranch Parkway to allow crews to work safely. Though some stops are closed, the Route will remain in service. Customers should sign up for RTD’s Service Alerts and use the Trip Planner app to plan an alternate route.

Business Access has permanently changed to right-in, right-out only at private driveways and un-signalized intersections between Highlands Ranch Parkway and C-470. Left turns at Norwood Drive, Carder Court, Brandon Drive, Grace Presbyterian Church, and Spring Gulch Equestrian Area are no longer allowed. View business access changes.

As always, we ask you to please continue to pay extra attention and follow all posted signage through the construction zone. Expect increased enforcement to ensure the safety of crews and motorists. Pedestrians and bicyclists are not permitted in the work zone – please use signed and signaled intersections to cross US 85.

Project Photos