Alert

In observance of the Thanksgiving holiday, all Douglas County Government offices will be closed Thursday, Nov. 28, and Friday, Nov. 29, 2024. Offices will reopen on Monday, Dec. 2, for normal business.

×

01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Elections
Health Department

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers
Birth/Death Records
Restaurant Inspections
Community Health
Child Care Center Inspections
Septic System Inspections
Emergency Preparedness & Response
Disease Surveillance
Mental and Behavioral Health Education
Community Health and Clinical Services
Women, Infants and Children

03.

×
× Close
Building Division

Retaining Wall

A building permit and engineered design is required for a retaining wall when the wall is over 4 feet in height measured from the top of the wall to the bottom of the footing or if supporting a surcharge. (See illustrations below to determine if a surcharge is present) Terraced or tiered retaining walls require a building permit and engineered design if the walls are over 4 feet in height or spaced apart at a distance less than two times the height of the lower wall. The following is required for submitting a retaining wall permit:

  • Building Permit Application. If contractors are being used they must be listed on your application at the time of submittal (Homeowner Agreement Form).
  • One set of retaining wall construction plans, stamped, and signed by a Colorado registered professional engineer.
  • One site plan showing the dimensions to the property lines.  NOTE: It shall be the sole responsibility of the property owner and/or permit holder to verify the location of all utilities and easements including water, sewer, well, septic, electric, phone, cable, fiber optic and gas prior to excavation or construction of any structure. 
  • Letter from the Architectural Control Committee.  If you do not have this letter, please be advised that your permit will be placed on “hold” for approximately five working days so that we may inform them in writing, unless you obtain the approval letter prior to the release of the permit.
  • Retaining wall permit fees are determined by the project valuation which includes materials and labor.

During construction of the wall(s), it is the responsibility of the permit holder to have the engineer of record perform an inspection(s) to ensure the construction is in compliance with their design and the approved plans. Upon completion of the retaining wall, copies of the Engineer’s inspection report or observation letter shall be submitted to the Douglas County Building Department to finalize and close out the building permit.