The Douglas County Recording Office is relocating from January-June 2025 due to construction. Click here to learn more about the Recording Office renovation project or to schedule an appointment at the new temporary location.
The Douglas County Recording Office is relocating from January-June 2025 due to construction. Click here to learn more about the Recording Office renovation project or to schedule an appointment at the new temporary location.
Under Construction
Updated January 10, 2025
2025 project schedules are anticipated to be available in February – please check back then. Work is scheduled to occur during the summer school break.
Douglas County’s 2025 street paving program in Ponderosa Hills includes Lost Canyon Trail from Ponderosa Drive to Deertrail Drive, Woody Creek Road from Ponderosa Drive to Deertrail Drive, Timber Lane, Forest Canyon Drive from Pine Cone Road to Summit Road, Piney Creek Road from Woodland Trail to the east end of the street, Sand Creek Road, Evergreen Trail, and Pine Vista Trail.
Work will be completed in phases – the first phase consists of preparing the road for paving, including grading, stabilization, and culvert inspection and repair. This prep work will be performed by Public Works Operations crews. The second phase consists of paving the main roadway by the County’s Asphalt Overlay Contractor. The final phase includes shouldering and driveway tie-ins, performed by Public Works Operations crews.
During construction, access to driveways will be available, with occasional short delays.
One to two weeks before the start of work, the County will send Cone Zone Mailers to notify adjacent residents of the planned work.
Variable messages signs will be used to notify residents of upcoming work.
Two days before the start of work, no-parking signs may be posted along the streets scheduled for work. Construction will occur Monday through Friday between 7 a.m. – 7 p.m.