Under Construction
Large Rural Culvert UV CIPP Lining Project
The project will repair 397 linear feet of 60-72 inch diameter storm sewer in various locations within unincorporated Douglas County. The project is anticipated to last from October 2023 through January 2025 and will be completed as weather allows.
These types of projects involve lining roadway culverts. These culverts range from 15 to 120 inch in size. The linings vary from slip lining to cured in place pipe, and the capacity is observed at each crossing to keep historic flow conditions.
Project Manager
Nick Keating
[email protected]
303-660-7490