Please contact your Project Engineer for access to interactive fillable PDF forms at 303-660-7490. Otherwise, the following PDF forms can be printed and filled out manually.
- Extended Detention Basin (EDB) – Standard Operation Procedure
- Porous Landscape Detention (PLD) – Standard Operation Procedure
- Sand Filter Basin (SFB) – Standard Operation Procedure
- Standard Operating Procedure (SOP) For Grass Buffers (GB) and Grass Swales (GS) Inspection and Maintenance
- Stormwater Management Facility Maintenance and Inspection Form
- Stormwater Management Facility Operation & Maintenance Manual