Alert
In observance of Christmas, all Douglas County offices will close at noon on Tuesday, Dec. 24, and be closed for the entire day on Wednesday, Dec. 25, 2024. Offices will reopen at 8 a.m. on Thursday, Dec. 26, for normal business. Offices will be closed on Wednesday, Jan. 1, 2025, in observance of New Year’s Day and reopen at 8 a.m. on Thursday, Jan. 2, for normal business.
×

01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Elections
Health Department

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers
Birth/Death Records
Restaurant Inspections
Community Health
Child Care Center Inspections
Septic System Inspections
Emergency Preparedness & Response
Disease Surveillance
Mental and Behavioral Health Education
Community Health and Clinical Services
Women, Infants and Children

03.

×
× Close
Public Works

US 85 Widening from Highlands Ranch Parkway to C-470

Under Construction

Budget

Total Approximate Construction Cost = $108 Million

Project Manager

Douglas County / CDOT / Kraemer North America
[email protected] 719-695-0052

Contractor

Kraemer North America
[email protected] 719-695-0052

Partners

  • Douglas County
  • CDOT
  • Chatfield Basin Developers (Sterling Ranch and Solstice Development)
  • Federal Highway Administration (FHWA)
  • Denver Regional Council of Governments (DRCOG)
  • Highlands Ranch Metro District

Project Update

Click here to receive updates on this project by email

Updated December 20, 2024

Crews have completed moving travel lanes on US 85. Traffic will continue to use the existing signalized intersections for left-turn access.

To ease holiday travel for the public, there will be no scheduled impacts or construction activities from Saturday, Dec. 21, 2024, until Monday, Jan. 6, 2025.

See the “Schedule” section below for more detailed information on traffic impacts. For background information prior to construction, visit US85DouglasCounty.com

Description

This project will improve safety, mobility, and traffic operations by widening (from four to six lanes) and reconstructing a segment of US 85 (South Santa Fe Drive) from Highlands Ranch Parkway, extending north of  the C-470 Interchange to Dad Clark Gulch (which is located approximately 1,200 feet north of County Line Road). Major US 85 intersection improvements will occur at Highlands Ranch Parkway, Town Center Drive, Blakeland Drive, the C-470 Interchange ramps and at County Line Road. The project also includes the replacement and widening of the existing bridge that carries US 85 over C-470.

Multimodal improvements include bus stop enhancements, a new shared-use path for bicyclists and pedestrians on the east side of US 85, a below-grade crossing for the C-470 Trail at US 85, a below-grade crossing for the High Line Canal Trail at US 85, and a new pedestrian link from the Wolhurst community to the C-470 Trail.

The project also includes the addition of continuous auxiliary lanes, new asphalt paving, relocation of utilities, raised medians, new curb and gutter, and a new closed storm sewer system with water quality ponds.

Timeline: Fall 2022 to Fall 2025

Partial Continuous Flow Intersection (CFI) will be installed for the following traffic movements:

  • Southbound US 85 to Eastbound Highlands Ranch Parkway
  • Southbound US 85 to Eastbound Town Center Drive
  • Northbound US 85 to Westbound C-470

View a map of US 85 Interchange at the above 3 listed intersections.

Other projects along US 85 in Douglas County

Schedule

Dec. 21, 2024 – Jan. 6:

There will be no work activities or traffic impacts over the holidays beginning Saturday, Dec. 21, until Monday, Jan. 6, 2025. 

Major Impacts: 

  • No major impacts.

Daily Impacts:

  • No daily impacts.

Please give yourself extra time and pay attention to posted speed limits and signage. If weather conditions do not allow this work to take place as originally scheduled, crews will conduct this work at a later date.

Trail Closures
The new trail and underpasses are expected to open in early 2025. 

Bus Access: RTD, in partnership with the project team, has closed the Bus Route 402L stops on US 85 between County Line Road and Highlands Ranch Parkway to allow crews to work safely. Though some stops are closed, the Route will remain in service. Customers should sign up for RTD’s Service Alerts and use the Trip Planner app to plan an alternate route.

Business Access has permanently changed to right-in, right-out only at private driveways and un-signalized intersections between Highlands Ranch Parkway and C-470. Left turns at Norwood Drive, Carder Court, Brandon Drive, Grace Presbyterian Church, and Spring Gulch Equestrian Area are no longer allowed. View business access changes.

As always, we ask you to please continue to pay extra attention and follow all posted signage through the construction zone. Expect increased enforcement to ensure the safety of crews and motorists. Pedestrians and bicyclists are not permitted in the work zone – please use signed and signaled intersections to cross US 85.

Project Photos